Tag: since

  • What Rawa Energy Development Prospective Investors Should Know

    What Rawa Energy Development Prospective Investors Should Know


     

    Rawa Energy Development Ltd is a public limited company that was founded as a private limited company on August 16, 2009 and later converted to a public limited company on June 28, 2019. It is promoted by businesspeople with extensive experience in hydropower and other sectors for the establishment of Hydroelectric Projects (HEP) in Nepal. In Khotang District, the company operates a 3 MW Upper Rawa Khola Small Hydropower Project (URKHP), which has been in commercial operation since September 20, 2020. The project is being built using the BOOT (Build, Own, Operate, and Transfer) model.

  • NEPSE closes in the green: 1.02 points higher, while turnover falls to Rs 81.62 crores.

    NEPSE closes in the green: 1.02 points higher, while turnover falls to Rs 81.62 crores.


     

    The NEPSE index closed at 1,919.42 today, up 1.02 points from the previous trading day’s close. This is a 0.05% increase. Yesterday, the index rose 12.10 points.

    Today, the index opened at 1,920.09 and closed at 1,901.62. In contrast, it reached a high of 1,922.04 before closing at 1,919.42.

    Through 25,413 transactions, 258 scrips changed hands. A total of 2,539,048 shares were traded, totaling Rs. 81.62 crores in turnover. This is less than the previous day’s turnover of Rs. 1.443 Arba. This is the lowest volume since December 14th, 2022. At the time, the NEPSE index was hovering around 1800, with a turnover of Rs 72.78 crore.