Bhugol Energy Development Company Limited was formed as a private limited company on February 16, 2009, and was later converted to a public limited company on October 31, 2017, to allow for public participation. The company operates the 3.75-MW Dwari Khola Small Hydropower Project in Nepal’s Dailekh District, Karnali Province. The project began commercial operations on May 6, 2017, ahead of the required COD of June 30, 2017, and was built at a total cost of NPR 734 million (NPR 196 million per MW) with an initial debt-to-equity ratio of 82:18.