Tag: lab

  • Nepal Telecom – NTC 5G Trial Commences in Nepal

    Nepal Telecom – NTC 5G Trial Commences in Nepal


    Nepal Telecom (NTC), the country’s state-owned telecoms operator, has officially launched its long-awaited 5G trial to commemorate the company’s 19th anniversary. Nepal Telecom, the country’s state-owned telecom operator, had previously postponed 5G testing due to a lack of a device ecosystem. To commemorate its 19th anniversary, the telco tested its 5G cellular network in Babarmahal and Sundhara.

    Spectrum

    The network deployed in the Kathmandu districts of Sundhara and Babarmahal is using the 60 MHz spectrum in the 2600 MHz band given by the government. The 2600 MHz band provides a good balance of speed and coverage. According to a Nepalitelecom report, the trials are not available to the public and are conducted internally.

    The initial trials, which were supposed to begin in January 2023, have already begun one month later than projected. Nepal Telecom’s July 2021 trials were canceled when a change in administration hindered the requisite spectrum allocation.

    Sunil Paudel, MD of Nepal Telecom (NTC), has formally declared the launch of the long-awaited 5G experiment. However, no official launch date for 5G has been announced, however, officials have stated that it “should launch shortly.” Managing Director Sunil Paudel noted in a progress update on the company’s planned 5G rollout that Nepal Telecom (NT) has yet to evaluate the capabilities of its present mobile infrastructure to handle commercial 5G services in the future.

    Non-Standalone 5G (NSA)

    Nepal Telecom Corporation (NTC) will begin its 5G testing using Non-standalone (NSA) architecture and subsequently advance to Standalone architecture (SA). By changing the basic software, the NSA allows the operator to launch its 5G network on its existing 4G LTE infrastructure. The business has already developed two 5G-ready sites in Babarmahal and Sundhara. NTC is now testing available 5G devices on the network in Babarmahal and Sundhara, having installed the essential equipment at both locations.

  • Asian Hydropower Opening Issue of 697,200 Unit IPO Shares to General Public from Today

    Asian Hydropower Opening Issue of 697,200 Unit IPO Shares to General Public from Today


    Asian Hydropower Limited will issue 6,97,200 unit shares with a face value of Rs 100 starting today, March 27th, 2079. The company expects to earn Rs 6.97 crore from this IPO. This issue’s early closing date is Falgun 2, 2079, and if it is not fully subscribed, it can be extended until Falgun 12, 2079. Out of the total 840,000 units, 10%, or 84,000 units, have already been issued and allotted to Nepalese citizens working abroad, 2%, or 16,800 units, have been set aside for the company’s employees, and 5%, or 42,000 units, have been set aside for mutual funds. The remaining 6,97,200 units will be available to the general public.

     

  • Reminder! Last Day to Grab Dividend Proposed by SIC, LGIL and JBBL

    Reminder! Last Day to Grab Dividend Proposed by SIC, LGIL and JBBL


    The proposed dividends from Sagarmatha Insurance Company Limited (SIC), Lumbini General Insurance Limited (LGIL), and Jyoti Bikas Bank Limited are only available through today (JBBL).

     

    On Falgun 11, 2079, Sagarmatha Insurance Company Limited (SIC) has scheduled its 26th Annual General Meeting. 
    Starting at 10 AM, meeting will take place in Lainchaur Banquet, Lainchaur.

    Today is the last day to grab dividends proposed by Sagarmatha Insurance Company Limited (SIC), Lumbini General Insurance Limited (LGIL), and Jyoti Bikas Bank Limited (JBBL).

     

  • Molung Hydropower Company Allotted Shares to Project-Affected Locals and Nepalese Working Abroad on the 24th of Magh.

    Molung Hydropower Company Allotted Shares to Project-Affected Locals and Nepalese Working Abroad on the 24th of Magh.


    Molung Hydropower Company Limited has distributed IPO shares to project participants and Nepalese citizens working abroad. The allotment program ended on the 24th of Magh, 2079, and money will be refunded to non-allottee applicants beginning on the 29th of Magh, 2079.

    The company’s issued capital is Rs. 80.25 crores, of which 10%, or 8,02,500 unit shares worth Rs. 8.02 crores, were allocated to project-affected Okhaldhunga District residents. And in the meantime, beginning in Falgun 04, 34% of the company’s issued capital, or 27,28,500 unit shares, will be made available to the general public. 10% of the shares totaling 272,850 units were allocated for Nepalese citizens working abroad in this public issue, which was opened on Poush 19 and closed on 3rd Magh, whereas the issue was opened on Poush 19 and closed on 3rd Magh.

     

  • Shuvam Power IPO has received Rs. 1.51 Arba from 13.64 lakh applicants as of the last day.

    Shuvam Power IPO has received Rs. 1.51 Arba from 13.64 lakh applicants as of the last day.


    Shuvam Power Limited (SHUVAM) offered 481,882 units of shares valued at Rs. 4.81 crores to the general public as part of their Initial Public Offering (IPO) from the 18th to the 22nd of March, 2079.

    Out of the entire 580,580 units, 10%, or 58,058 units, have already been issued and assigned to Nepalese people working abroad, 2%, or 11,610 units, have been put aside for the company’s workers, and 5%, or 29,030 units, have been set aside for mutual funds. The remaining 481,882 units were made available to the general public. Following the IPO, the company’s paid-up capital will exceed Rs. 20 crores.